Step by Step Guide to Building Your Dream ADU
1. Initial Consultation and Planning
- Client Meeting: Discuss your vision, budget, and timeline.
- Site Assessment: Visit the property to evaluate the feasibility of the project, including site conditions and space constraints.
- Design Concept: Collaborate with Gem Builds to create initial design concepts that align with the your vision and comply with local zoning laws and regulations.
2. Design and Permitting
- Detailed Design: Develop detailed architectural plans, including floor plans, elevations, and 3D renderings if needed.
- Engineering: Coordinate with structural, electrical, and plumbing engineers to ensure all systems are integrated into the design.
- Permit Applications: Submit the necessary permit applications to local building authorities. This can include building permits, zoning permits, and any other required approvals.
3. Pre-Construction Preparation
- Budgeting and Financing: Finalize the budget and secure financing if needed.
- Scheduling: Develop a detailed project schedule outlining all phases of construction.
- Material Selection: Work with the client to select materials and finishes for the ADU, including flooring, cabinetry, fixtures, and appliances.
- Contracting: Finalize contracts with subcontractors and suppliers.
4. Site Preparation
- Demolition and Clearing: Clear the site of any existing structures or vegetation as needed.
- Excavation and Grading: Prepare the site by excavating and grading to ensure a stable foundation.
5. Foundation
- Foundation Construction: Build the foundation, which could be a slab-on-grade, crawl space, or basement depending on the design.
- Utilities Installation: Install underground utilities such as water, sewer, and electrical lines.
6. Framing
- Framing the Structure: Construct the framing for walls, floors, and roof according to the design plans.
- Roof Installation: Install the roof structure and covering to make the building weather-tight.
7. Systems Rough-In
- Electrical Rough-In: Install wiring, outlets, switches, and the electrical panel.
- Plumbing Rough-In: Install pipes for water supply, drainage, and venting.
- HVAC Rough-In: Install ductwork and HVAC components if required.
8. Inspections
- Rough-In Inspections: Schedule inspections for electrical, plumbing, and HVAC systems before closing up walls.
- Structural Inspections: Ensure the framing and structural components meet building code requirements.
9. Insulation and Drywall
- Insulation: Install insulation in walls, floors, and ceilings to meet energy efficiency standards.
- Drywall Installation: Hang drywall, tape, and finish the seams.
10. Interior and Exterior Finishes
- Interior Finishes: Install flooring, cabinetry, countertops, fixtures, and appliances.
- Exterior Finishes: Complete exterior siding, painting, roofing, and landscaping.
11. Final Inspections and Approvals
- Final Inspections: Schedule and pass final inspections for all systems (electrical, plumbing, HVAC) and overall building compliance.
- Certificate of Occupancy: Obtain a Certificate of Occupancy from the local building authority, allowing the ADU to be legally occupied.
12. Final Walkthrough and Handover
- Client Walkthrough: Conduct a final walkthrough to address any concerns or last-minute adjustments.
- Handover: Provide all necessary documentation, warranties, and maintenance information.